City of Owen Sound

City of Owen Sound

road construction
includes asphalt resurfacing

Owen Sound Transportation Master Plan

East Owen Sound Master Servicing Study

 

All links are to Adobe PDF documents. Each link will open a new window in your browser. Close the new window to return to this page.

Operations : Engineering : Master Servicing Study : Volume 1

Volume 2 - Storm Water Management Study

 

Document

File Size
  Table of Contents 109 kb
  Stormwater Management Study 1.87 mb

Appendix

 
  Appendix A - Telfer Creek 850 kb
  Appendix B - Kenny Drain 3.45 mb
  Appendix B1 - Kenny Drain (Existing Condition) 4 mb
  Appendix B2 - Kenny Drain (Proposed Condition) 7.1 mb
  Appendix B3 - Kenny Drain Hec-Ras Modelling 1.73 mb
  Appendix C - Telfer Creek and Kenny Drain Erosion Analysis 1.36 mb
  Appendix D - East Bluffs Storm Sewer 363 kb
  Appendix E - 15th Street East Storm Sewer Analysis 3.23 mb
 

Appendix F - Figures and Drawings

 
  HEC-1 - Kenny Drain Floodplain Map 651 kb

     Figures

 
  Site Location Plan - FIG1 (NTS) 53 kb
  FIG 2 - East Bluffs South Storm Sewer Analysis Scenario # 1 218 kb
  FIG3 - East Bluffs South Storm Sewer Analysis Scenario # 2 234 kb
  FIG4 - East Bluffs North Storm Sewer Analysis 237 kb

     Drawings

 
  Drawing SWM1 - East Owen Sound Catchment Areas with Official Plan 2.3 mb
  Drawing SWM2 - East Bluffs Storm Sewer Catchment Areas 190 kb
  Drawing SWM3 - Telfer Creek Exising Conditions Plan 34.82 mb
  Drawing SWM4 - Telfer Creek Proposed SWM Plan 1.62 mb
  Drawing SWM5 - Kenny Drain Existing Conditions Plan 2 mb
  Drawing SWM6 - Kenny Drain Proposed SWM Plan 1.9 mb
  Drawing SWM7 - Kenny Drain Proposed SWM Plan with Aerial Photography 34.48 mb
  Drawing SWM8 - Kenny Drain SWMHYMO Flow Schematic 161 kb

Previous Page

 

©2012 City of Owen Sound